This
lift’s hand rails and front plates were only a small part of the
work carried out for The New Armouries at the Tower of London. This
exacting project included additional barrier and steel fitment work to a
very high specification.
This
office entrance was commissioned for premises in Shoe Lane, London. The
work included an extensive venting system, stainless steel ceiling, and glass
channeling.
The project was completed in March 2000.
Click on pictures to
see larger versions.
Abbott
Fabrications - stainless steel and sheet metal fabrication engineers for exhibition, architectural, food industry,
prototype and shop fitting work. Higham Ferrers, Wellingborough,
Northants, Northamptonshire.